Plumbing

VRA Office Tower

Plumbing installation for the Volta River Authority office tower: soil and waste drainage, water supply pipework and concealed WC systems.

VRA Office Tower
Client
Volta River Authority
Scope
Plumbing

Scope of works

5 Star Engineering Limited delivered the plumbing installation for the Volta River Authority office tower, a circular high-rise building.

Soil, waste and vent drainage was run at high level beneath each floor slab, with branches gathered into vertical stacks and carried down through the building. Pipework was bracketed to the soffits and set out to suit the floor plates before ceilings and finishes followed.

Water supply distribution was installed in PPR pipework to the washrooms on each floor, serving concealed Geberit WC frames and cisterns fixed ahead of the wall finishes.